The Hammarlund manual provides detailed installation and alignment instructions for adding a 160 meter band kit to the HX-50 Transmitter/Exciter, including steps for preparing and installing various coils and components. It also includes troubleshooting guidance, such as checking crystal oscillation and adjusting RF drive, to ensure proper operation within the specified frequency range.
Manual Overview
The Hammarlund HX-50 Transmitter/Exciter manual provides detailed instructions for installing and aligning the 160-meter band kit. The process begins with removing the transmitter chassis and carefully managing the lead dress to maintain bandpass characteristics. The manual specifies wire lengths and colors for connections to various coils, identified by colored dots. Installation involves soldering wires and capacitors to specific terminals, ensuring proper alignment and avoiding interference with other components. The alignment procedure requires disconnecting the screen resistor and using an RF voltmeter to verify crystal oscillation. The manual outlines a sequence for peaking the 160-meter coils and provides guidance on setting the frequency dial and tuning parameters. Proper loading of the 160-meter band is limited to frequencies between 1.8 and 2.2 MHz, with specific dial readings for optimal performance. The manual emphasizes the importance of experienced personnel performing these modifications due to the complexity and precision required.
Quick Issues Covered
- Diagnose power-up issues with 160 meter band kit installation.
- Calibrate RF drive using alignment procedure for optimal performance.
- Trace circuits using detailed schematics for troubleshooting.
Installation / Setup
The installation of the 160 meter band kit into the Hammarlund HX-50 Transmitter/Exciter involves several detailed steps. The process begins with removing the transmitter chassis and ensuring that the lead dress to other coils is maintained to avoid disturbing the bandpass characteristic. The installation includes cutting wires to specific lengths, preparing and installing various coils, and soldering components according to the provided instructions. The alignment procedure involves disconnecting certain resistors, using an RF voltmeter to check oscillations, and peaking the 160 meter coils in a specific sequence. The final steps include connecting a dummy load to the RF output connector and adjusting the frequency dial and PA tuning to achieve proper loading. The kit can only be properly loaded from 1.8 to 2.2 mc, with typical dial readings provided for reference.